FLNG Design and Technology

Tickets

Registrations are closed

FLNG Design and Technology

FLNG Design and Technology
12 - 16 May 2024
Madrid, Spain
Spain

What are the Goals?

By the end of this training course, participants will be able to:

  • Identify the key design requirements for an FLNG
  • Recognize the effects of the ocean environment on FLNG design
  • Understand the liquefaction and regasification technologies
  • Interpret applicable rules and regulations, industry standards and regulations and environmental considerations
  • Appreciate safety in design and operation

Who is this Training Course for?

This training course is suitable to a wide range of professionals but will greatly benefit:

  • Designers, Managers & Operators
  • Technical staff
  • Project engineers
  • Engineering discipline leads
  • Engineering specialists
  • Operating staff

Daily Agenda

Day One: Understanding the Basic Concept of a FLNG

  • Introduction to floating LNG concepts
  • Advantages and disadvantages
  • FLNG vessel design
  • Class, rules, design codes, standards and regulations
  • Design considerations, challenges and limitations
  • Shipbuilding and offshore approach

Day Two: Comprehension of the LNG Process Plant

  • The basic concept from well to LNG
  • LNG Specifications
  • Various gas treatment concepts and HHC removal
  • Various liquefaction technologies
  • Production system challenges and selection of the major equipment
  • Power, heating and cooling systems
  • Regasification

Day Three: The Impact of the Ocean Environment on FLNG Topside Design

  • Key metocean design criteria
  • Hull configuration and key safety and technology issues
  • FLNG topside modular design and layout
  • Interfaces and interface management
  • Turret and swivel systems
  • SURF and subsea interfaces

Day Four: LNG Containment and Transfer System

  • LNG storage tank design
  • Storage tank insulation
  • Sloshing damage
  • Boil-off effects (roll over, density stratified liquid layers, natural convection within an LNG tank)
  • Storing other products (LPG, condensate, etc.)
  • Tank loading preparation
  • LNG Carriers
  • LNG transfer systems
  • LNG carrier loading operations
  • Offloading risks

Day Five: Other Design Requirements

  • Control and safety systems
  • Electrical design
  • Piping and cryogenic piping design
  • Dynamic process simulation
  • Safety in design and operation
  • FLNG commissioning

Tickets

Registrations are closed
Date & Time
Sunday, May 12, 2024
Start - 10:00 AM (Asia/Kuwait)
Thursday, May 16, 2024
End - 10:00 AM (Asia/Kuwait)

Add to Calendar

Location

Madrid

Madrid
Spain
--Madrid--

Get the direction

Organizer

Seattle international for training

info@seattle-int.com
SHARE

Find out what people see and say about this event, and join the conversation.