Best Practices in Surface Production Operations Management
Tickets
Registrations are closed
Best Practices in Surface Production Operations Management
Best Practices in Surface Production Operations Management
18 -
22
Aug
2024
Istanbul,
Turkey

What are the Goals?
The goal of this course will focus on the following objectives:
- Understand the challenges associated with production operations management
- Highlight best practice in metering, deferment administration and planning
- Generate strategy to meet the business-driver in an asset using case study
- Provide appropriate improvement process
By the end of this training course, you will learn to:
- Manage an operating asset with best-in-class practice initiative
- Understand the best management approach peculiar to your asset
- Recognize what to watch for in production operations practice
- Develop asset-specific integrated production plan
- Develop asset specific metering and deferment framework
Who is this Training Course for?
This training course is suitable to a wide range of professionals but will greatly benefit:
- Production Operators
- Field Production Personnel / Supervisors / Superintendents
- Production Engineers
- Asset Managers and Senior Managers
- Asset Support Engineers
- Process Engineers
- Reservoir Engineers
- Planning Engineers
- Production Accountants/Engineers
Daily Agenda
Day One: Overview of Surface Production Operations
- Introduction to Surface Production Operations
- Tools Supporting Operations Management
- Overview of Well, Reservoir & Facility Management (WRFM) process
- Metering Systems
- Operations Integration
Day Two: Production Deferment Administration
- General Principles of Deferment Administration
- Measurements
- Deferment Coding
- Roles & Responsibilities
- HCA Applications
Day Three: Production Allocation & Reconciliation
- Principles of Production Allocation & Reconciliation
- Domain Experts & Required Technology
- Populating and verification/validating process of data
- Allocation & Reconciliation
- Standard HCA Business Workflow
Day Four: Integrated Production/Injection Planning
- General Principles of Activity Planning
- Overview of Water-Injection System
- Business Objective for Integrated Production Planning
- Common Tools Required
- Challenges in Integrated Production Plan
- Integrated Production Plan Workflow
- Strategy in Generating Robust Plan linked to the Business
Day Five: Performance Review
- Case Study
- General Course Review
- Assessment of Participants
- Feedback
- Closing Remarks
Tickets
Registrations are closed
Related Cources
Mechanical Maintenance Specialist: Pumps, Compressors & Rotating Machinery
29 -
03
Jun
2025
Austria,
Austria

Life Safety Engineer: Facility Life Safety Systems & Regulations
29 -
03
Jun
2025
London,
United Kingdom

Corrosion Control & Material Selection in Refineries
30 -
04
Jun
2025
Zurich,
Switzerland

Corrosion Control & Material Selection in Refineries
30 -
04
Jun
2025
Dubai,
United Arab Emirates

Advanced Gas Metering & Custody Transfer Systems
30 -
04
Jun
2025
Zurich,
Switzerland

Advanced Gas Metering & Custody Transfer Systems
30 -
04
Jun
2025
Dubai,
United Arab Emirates

Field Development Planning & Advanced Optimization
30 -
04
Jun
2025
Zurich,
Switzerland

Field Development Planning & Advanced Optimization
30 -
04
Jun
2025
Dubai,
United Arab Emirates

Advanced Drilling Optimization & Automation
30 -
04
Jun
2025
Zurich,
Switzerland

Advanced Drilling Optimization & Automation
30 -
04
Jun
2025
Dubai,
United Arab Emirates
